Notice of Traffic Control on Lower River Road for Water Treatment Plant Solids Mitigation Project
PRESS RELEASE
FOR IMMEDIATE RELEASE
DATE: November 3, 2023
CONTACT: Mark Juras – (406) 771-1258
Notice of Traffic Control on Lower River Road for Water Treatment Plant Solids Mitigation Project
GREAT FALLS, Montana – The City of Great Falls has a contract with Sletten Construction for a project at the Water Treatment plant located at 1301 Lower River RD. The contractor will be utilizing traffic control measures near the water treatment plant on Lower River Road between November 6th and November 10th, 2023. Sletten will provide signage and flagging traffic control along the curve of the road at the plant and there will be a truck turn around area located approximately 1.7 miles south of the plant. Local access will continue to be maintained during construction. The public’s patience and consideration during this process is appreciated. For more information about the traffic control measures please contact Matt Popa with Sletten Construction at (406) 454-6439.
#